RASIM ... Analysis and planning of operational concepts and -lay close by shunting simulation

The problem

Rail goods traffic causes substantial costs, both in reproaching the infrastructure and during operation. This applies particularly to areas, where wagons have to be shunt and trains have to be resolved and formed.
At the same time the requirements rise in the quality of logistic services. Modifications of production struc-tures also always affect the feed sector. Operational concepts must be modified accordingly, the resour-ces and infrastructure must be adapted to the requirement.

For the provider of rail goods traffic performances thereby the following questions arise:

gleisplan

The solution

The simulation and planning system RASIM was developed in order

operation procedures within shunting areas.

A special advantage exists in the possibility of exchanging data with the railway management system RADIS. As a result of this system network a computer-aided complete supply arises from the planning over the conversion up to the controlling of the daily operation procedure.

The application

The results

Analysis of the track holding time

gleisbelzeiten gleisbelplan

The supply

References

The program system RASIM worked satisfactorily in numerous applications. It is used at the following customers:

Contact

Don't hesitate to contact us for further information:

Dipl.-Ing. B. Bieder
Telephone: (0511) 33 6 99 - 460
Fax: (0511) 33 6 99 - 199
e-mail: burkhard.bieder@hacon.de

Dr.-Ing. J. Hildebrandt
Telephone: (0511) 33 6 99 - 461
Fax: (0511) 33 6 99 - 199
e-mail: jan.hildebrandt@hacon.de